(Update) Meadowbrook Clubhouse Design has been approved!

(Update) Meadowbrook Clubhouse Design has been approved!

In the nearly 100 years since its founding, Meadowbrook Golf Course has seen its share of changes. Through floods, storm damage and frigid winters, the one constant has been the unrelenting support of the Twin Cities golf community. So, in 2016 when a burst pipe caused irreparable damage to the clubhouse, golfers and staff immediately began brainstorming what the future of the golf course and the clubhouse might look like. Fast forward five years and the Minneapolis Park and Recreation Board (MPRB) has teamed with HCM Architects to answer that question.

Meadowbrook - Pergola Side Render.jpg

Working closely with MPRB which serves as both Owner and Landscape Architect, HCM and the design team of Loucks (Civil), BKBM (Structural) and Emanuelson Podas (MEP) have developed a conceptual scheme that looks to celebrate the rich history of Meadowbrook while looking well into the future. The compact yet flexible form will be made from durable, commodity materials that reflect the surrounding neighborhood. Relocating the clubhouse atop the hill also lends itself to future events where a large tent pad and outdoor vendor area are planned.

Go visit MPRB PARK & RECREATION BOARD for more information and get a peak of the plans!

latitude studios co. website up and running!

latitude studios co. website up and running!

“FIND THE PERFECT STUDIO FOR YOU”

Congrats Andy on the start of Latitude Studios, a Minnesota-based company that provides an efficient, economical, modern solution for today’s work and play at home lifestyle.

Go visit: latitude-studios.com/

Configure your own Live/Workspace to meet your needs. Latitude offers a creative solution using upcycled shipping containers customized to meet your desired use.

Offering 2 base models to choose from which you can then make your own.

office studios

ROOF OVERHANG & SITE.jpg
ROOF & OVERHANG & SITE 2.jpg

versatile studios

20FT CONTAINER.jpg

Latitude Studios Back Yard Office Concepts

HCM has begun working with Andrew Berg of Latitude-Studios preparing concept level renderings for a new growing trend of Tiny backyard offices “ office in a box”. These tiny spaces are becoming much more popular, especially now as people continue to work from home during these times of COVID, But these little one-room affordable dwellings can fill multiple functions such as: workout / yoga rooms, man caves, studios, etc.

PATIO OPTION & SITE 2.jpg
EXEC OPTION & SITE.jpg
20FT CONTAINER & SITE.jpg

Woodbury City Hall Site Observation

IMG_7132.JPG

Significant progress has been made at Woodbury City Hall. During a site visit last Thursday we were able to observe various stages of construction throughout building. One of the main design features the entire project, the front desk / lobby redesign is finally starting to take shape with the installation of the Kasota Limestone at the front desk and service counter.

IMG_7129.JPG

Millwork and countertops currently being installed along with the laminated glazing assembly that matches the existing color of the curtainwalls is really starting to give an overall view of the final product.

IMG_7138.JPG
IMG_1957.JPG

Various offices, New & Existing are in the process of receiving paint, carpet, and glazing. .

IMG_7146.JPG

While the Millwork in the Break room have been completed.

Dejong Farm Progress Update

Significant progress has been made to the cottage since we have last seen it. All of the exterior work has been completed and now all the focus turns to the interior finishes / details.

62561085720__E0ACF8DE-2625-4647-AFB7-9E0EFBC2704F.jpeg
IMG_0130.jpeg

In the kitchen, the white millwork cabinets and subway tile backsplash have been installed along with the solid surface counter.

1D10E271-339B-49C0-8EA0-2CE40396F3B4.jpeg

The view from the bedroom down to the living and dining room space show the shine of the newly polished concrete flooring .

E51CB713-E567-45D4-8151-9C8F550D4CF1.jpeg

Finally, sliding barn doors also being installed.

PEONY LANE TRAILHEAD UPDATE

IMG_5740.JPG

Peony Lane Trailhead keeps chugging along as through mid October. Versacon has this building on the final phase of construction. Some exterior work still being done while beginning work on the interior spaces. Project Completion is projected to be around the end of November excluding sitework.

IMG_5729.JPG
IMG_8661.jpg
IMG_5732.JPG

VIRTUAL REALITY LAB AT DREAMTRACE

Matt Lysne and Josh Tindall from HCM visited DreamTrace in Roseville, MN earlier this month to experience their Virtual Reality Lab and learn more about how it can be used to help clients visualize and understand their projects in three dimensions.

Virtual Lab image 1.jpg
Virtual Lab image 2.jpg

HCM's 2nd Annual Sporting Clay Outing

HCM Celebrated it’s 2nd Annual Sporting Clay event. The HCM crew went out to the Minnesota Horse and Hunt Club for an adventure consisting of lunch, sport clay shooting, and an after shooting social hour. The weather was perfect for a fun, afternoon of team bonding and competitive shooting.

IMG_6928.JPG
IMG_6923.JPG
IMG_6939.JPG
IMG_6936.JPG

A little whimsical cottage progress!

A little whimsical cottage progress!

An HCM Design by Roger Christensen for a close friend out east, built for his sister-in-law, this little cottage in Virginia sits on the owners’ farmland overlooking the picturesque views of the Blue Ridge Mountains. The clean lines and bold black help it stand out amidst the beautiful mountainous backdrop. All the traditional elements and warmth of a typical cottage with a modern twist gives this little home a sleek, simplistic profile. Some of the design features include:

1964-DeJong-Farm---Smaller.jpg
  • SIPS Panel Construction

  • Custom timber trusses

  • Metal roof

  • Radiant floor

Look at that view!

IMG_3461.jpeg
62169913028__B325F235-051C-4E87-9679-9079E73DA995.jpeg
IMG_0092.jpg
62169947687__2286CB37-33EF-427D-93C0-AE615F47DCD3.jpeg
IMG_0086.jpg

ESMF Rainwater System in action

ESMF Rainwater System in action

The Mississippi Watershed Management Organization contributed input and provided a grant for enhanced stormwater solutions on the City of Minneapolis Eastside Maintenance Facility.

Please take a minute to look over there site if you are interested.  This group is doing great work to help reduce pollution and salination of one of our most valuable resources, while also providing immediate benefits related to reduced street flooding and increased pollinator habitats.

See more about this project:

http://www.mwmo.org/projects/eastside-maintenance-facility/

BioTechne GMP Facility Updates

BioTechne GMP Facility Updates

Each week we continue to see significant progress at the BioTechne Saint Paul Facility.

The Penthouse is full of all the large Air Handling Units. The contractor has also started to install the Boiler, Chilled Water pumps, and supporting pipe / electrical panels.

On the Main level, we complete an Area rough-in walk through with the Owner each week. This ensures we are locating all the power, data, and other required utilities to each piece of equipment. As the rough-in walk through of each Area is complete, the contractor starts to close up the walls. As you can see in the attached image, Area A3 has purple board installed; next step in this Area is taping and mudding!

We are also seeing new equipment, large and small, arrive on-site. The large equipment is being rolled into place for the Team to review and make sure the utilities supporting it are installed in the correct locations.

The exterior chiller plant is also making headway. The wrap has been removed from the units and connections are being made between the units to the supporting equipment in the Penthouse above.

Next week we expect to see Metal Panel being installed at the Office Area which will be an exciting sight!

20200624_112957.jpg
20200701_110638.jpg
20200701_115818.jpg
20200624_082812.jpg

HCM Visit to Wildwood Library

The HCM Office took a field trip to see the outcome of the Wildwood Library project that has finally wrapped up! The library will be opening at limited capacity on Monday, July 20, but our firm got a sneak peek ahead of the future grand opening. The library is a remodel of an existing building that was in the same location, but was demolished to allow for a brand new library to take its place. Some project highlights include the large glazing that allows for an optimal amount of daylighting and a feature fireplace with massive hand painted decorative tile. To see the progress of the construction of this building over time, click here and watch the Sensera time lapse.

THANK YOU LINDSAY!

HCM Architects would like to bid farewell and good luck to one of our fellow staff member Lindsay Leon as she returns back to her home state of California. She will be attending University of Southern California (USC) to begin her graduate program. We just want to give her a big THANK YOU!!! For not only all the work and projects you helped with here in your two-and-a-half-year journey with HCM, but for your friendship too. We wish you the best and know that you will do great at USC. Don’t be a stranger and good luck from all of us!

Something to look forward to

Here at HCM Architects, we know you miss traveling in the pre-pandemic days. We want to give you something to look forward to for when you finally return to the Minneapolis International Airport! We do a lot a hospitality projects at the airport and we have recently received updated photographs of some of our latest projects. Our projects vary from Minnesota classics like Caribou Coffee to gems like Zona Cocina. Take a look and plan where you want to go while you’re waiting for your next flight at MSP.

BioTechne GMP Facility Updates

BioTechne GMP Facility Updates

20200617_115256.jpg

The construction team keeps chugging along over at the BioTechne St. Paul site. Now that it is midway through June, our team has walked through and finalized all the electrical details so that anything that needs to be changed can be changed before the interior walls are sealed up and ready for equipment to be brought in. The exterior of the office portion of the building is ready to have metal panels attached to complete the shell of the building, giving it the sleek, tech look that will give it a BioTechne feel. The penthouse on the roof is built and the Air Handling Units are starting to be put in place inside. They will support the equipment and building functions below. Week after week this building continues to transform.

20200617_120208.jpg
Lindsay1.jpg

City of Woodbury Public Works

City of Woodbury Public Works

Woodbury_Public_Works_0013.jpg

HCM Architects is proud to show the results of our hard work on the City of Woodbury Public Works facility through a new collection of photographs taken by photographer Steve Silverman. The project was completed in 2019. The goal, after gaining an understanding of the City’s long-term vision, was to expand and consolidate the existing facilities to meet the demands of the city’s growing community. The facility consists of both office space and maintenance space allowing for coordination of work activities as well as facilitating efficiency, safety flexibility and communication. See below for an assortment of images of the new space.

HCM's Statement on Social Justice

Social Justice Banner blog.png

As Minnesotans, we stand in solidarity with our communities of color to denounce racism, violence, and inequality in our city and, beyond that, our nation. At HCM we are listening to communities who are grieving and supporting those crying out for justice. We have much to learn from you - our friends, neighbors, clients, coworkers, and valued members of our community. We are thankful to be a part of this city and we are committed to doing this work together.

We echo and endorse the AIA’s Statement on Systemic Racial Injustice. Below is a portion of their address, but we encourage everyone to read their full statement.

“More than half a century has passed since Dr. Whitney M. Young, Jr. observed that “Decent people have to learn to speak up, and you shouldn’t have to be the victim to feel for other people.” We can’t change the past, but we can, and do, promise to harness the passion of our members and the broader design community to help lead efforts to dismantle the system of racial injustice that continues to end far too many lives and dim far too many futures.

AIA’s promise from this day forward is to hold close the anger, anguish, but above all, compassion we’ve heard from our members demanding that AIA speak out more clearly and urgently on racially motivated acts of violence and police brutality.”

Read full statement here:

GMP Manufacturing Facility Build-Out

IMG_2971.jpg

May has been a busy month at the BioTechne GMP site. There has been some huge progress being made as the exterior work of the office piece continues and the the interior work throughout the facility begins in some areas and progresses in others. The huge facility requires many people working to keep the project running smoothly and the fantastic McGough Construction team is taking every precaution necessary to keep everyone on site safe and healthy while amidst the Covid-19 situation.

IMG_2970.jpg
IMG_2934.JPG

Lyndale Farmstead Park Community Building

IMG_0394.jpg

The renovation and addition to the Minneapolis Park and Recreation Board Lyndale Farmstead Park Community Building is nearing completion.  The exterior spring work is finishing up on the site and only a few minor punch-list items remain inside and out.  We have had a great time working with MPRB and the EHF Neighborhood Association on this project and look forward to a grand opening once the current Covid-19 issues have subsided.

IMG_0391.jpg