The HCM Office took a field trip to see the outcome of the Wildwood Library project that has finally wrapped up! The library will be opening at limited capacity on Monday, July 20, but our firm got a sneak peek ahead of the future grand opening. The library is a remodel of an existing building that was in the same location, but was demolished to allow for a brand new library to take its place. Some project highlights include the large glazing that allows for an optimal amount of daylighting and a feature fireplace with massive hand painted decorative tile. To see the progress of the construction of this building over time, click here and watch the Sensera time lapse.