In the final month of construction, Banner Engineering is receiving paint on the walls, stair glass guardrails are being installed and millwork, ceilings, and lighting are being situated throughout.  Furniture will be installed mid July and owner move-in is slated for the beginning of August. 

20180612_074427_1528897248427_resized.jpg
20180529_074322_resized.jpg
20180529_075506_resized.jpg