Temp Window Enclosures have been installed and window restoration started. The loading Dock Removal is wrapping up. Abatement Continues and slab removal in Lower Level continues. Level one compete demolition is nearly finished. The design team continues to work through the historic process with Window mock-ups and brick matching. As the demolition continues the sea of columns are being exposed; the new stair wells and shafts are being cut in. What a transformation as we get down to the old infrastructure.